+86 13383791128

info@meichensteel.com

Bearing industrial park in Yiyang County Luoyang City, China

Sanjian Meichen Steel Structure

Sanjian Meichen Steel Structure

We Help You Build Bigger And Stronger Steel Structure Industrial Parks Faster.

Design & Production & Installation

Learn More
Integrity, Cooperation, Sharing, Win-win

Integrity, Cooperation, Sharing, Win-win

Building Tomorrow’s Logistics Warehouse With Precision Steel Structures.

Pioneers in steel structure solutions since 1999

Learn More
Design & Manufacturing
Innovative Design, Pushing The Limits
Cableway Drive Station
Cableway Drive Station

Steel Linkway
Steel Linkway

Highway Toll Station
Highway Toll Station

Flare Support Structure
Flare Support Structure

Large-Span Steel Portal Frame Workshop
Large-Span Steel Portal Frame Workshop

Portal Frame Workshop
Portal Frame Workshop

Triple-span Steel Structure Project
Triple-span Steel Structure Project

Office Building Steel Structure Project
Office Building Steel Structure Project

Our Products And Project Portfolio
Proven steel structure solutions for factories, cold storage, logistics hubs, and precision engineering facilities.
Our Cooperation Process
One-stop foreign trade services
Packaging Details
01
Sign The Contract
02
Make Production
03
Packing, Storage And Transportation Of Materials
  • 01
    Frame Packaging

    The frame is suitable for materials that are not resistant to pressure and have special shapes.

    Frame Packaging
  • 02
    "u" Frame Packaging

    Suitable for producing large or small bundled steel components.

    Frame Packaging
  • 03
    Metal Box Packaging

    Suitable for connecting parts of steel structures

    Metal Box Packaging
  • 04
    Shipping Mark

    Strictly abide by regulations and meet contract requirements

    Shipping Mark
05
After-sales Service
04
Shipment By Sea
Start
Your Project With Us
Fast responses, professional support.
Request A Quote

Welcome To
Meichen Steel Structure

We are a professional double first-class steel structure qualification enterprise
About Meichen
Meichen Steel Structure
Our Customers
are all over the world
We are one of the regional brands with market value competition
  • 1999

    since

  • 30+

    exporting countries

  • 60,000m²

    the building area exceeds

  • 200+

    number of employees

Our Team
Powered By Experience. Driven By Precision. Focused On You.
News
Learn about our latest products and developments