As part of the wave of global collaboration, Sanjian Meichen Construction Technology Co., Ltd. is proud to contribute to the development of the North Kalimantan Aluminum Plant in Indonesia, a project jointly developed by Ningbo Lygend Resources Technology and its Indonesian partner.
In this project, Sanjian Meichen successfully won the contract for the steel structure supply of the Electrolytic Workshop (C-D span)—a critical section at the heart of the aluminum plant. This cooperation is not only an example of cross-border partnership, but also a shared commitment to green, efficient, and sustainable development.
Building type: Single-story industrial workshop
Eave height: 19.1 m
Ridge height: 22.3 m
Structure system: Portal frame, welded H-beam columns and beams
Steel grade: Q355B high-strength steel
Total steel weight: 4,700 tons
The electrolytic workshop is the “core engine” of the plant, and its structural integrity directly affects production efficiency and environmental performance.
Located in North Kalimantan’s tropical rainforest climate, the project faces high temperature, humidity, and heavy rainfall. To ensure long-term durability, we applied a multi-layer protective coating system:
Primer: Two layers of epoxy zinc-rich coating (zinc content >60%)
Intermediate coat: Epoxy iron oxide
Top coat: Weather-resistant acrylic polyurethane
The coating thickness reaches 60 μm, 80 μm, and 100 μm+ respectively, providing excellent anti-corrosion performance and extending the service life of the steel structure.
At Sanjian Meichen, we believe that every detail matters.
Advanced manufacturing: State-of-the-art equipment ensures dimensional accuracy, welding quality, and overall strength meet international standards.
Unique identification: Each steel component is labeled under a project-specific numbering system, enabling full traceability and faster on-site assembly.
Secure packaging & delivery: Following international packing standards, all steel members are protected against vibration, rust, and moisture. With professional transport solutions, the structures are safely delivered to Indonesia on time.
This project is a milestone in the aluminum industry of Indonesia and a vivid example of China’s enterprises contributing to Belt and Road initiatives. The partnership between Ningbo Lygend and Sanjian Meichen not only supports Indonesia’s industrial growth, but also sets a benchmark for green, efficient, and sustainable construction.
With years of experience in steel structure engineering, Sanjian Meichen will continue to provide integrated design, fabrication, and delivery solutions for international projects. We are committed to building long-term partnerships and delivering high-quality steel structures that stand the test of time.
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Petroleum & Natural Gas Riveting and Welding Factory
Steel Structure Factory and Warehouse Project for a Material Processing Production Base
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project
Oil & Gas Modular Steel Structure Fabrication Project