+86 13383791128

info@meichensteel.com

Bearing industrial park in Yiyang County Luoyang City, China

About
About
HomeAbout
Henan Sanjian Meichen Construction Technology

Henan Sanjian

Meichen Construction

Technology

SINCE IN 1999
Qualifications

Level 2 general contracting qualification for building construction

Level 1 qualification for professional contracting for steel structure engineering

Level 1 qualification for steel structure manufacturing

Certification

ISO9001:2000 international quality standard management system certification and environmental system certification

Occupational Health and Safety Management System Certification

EN1090 EXC3 steel structure manufacturing certification and ISO3834-2 welding quality management system certification

  • 1999

    since

  • 74,000m²

    occupy the area exceed

  • 50,000m²

    the building area exceeds

  • 200+

    number of employees


Meichen Steel Structures Co., Ltd. was established in 1999 and is located in the industrial aggregation area of Yiyang County, Luoyang City. The company covers an area of over 74,000 square meters, with a building area of over 50,000 square meters. The company owns five advanced steel structure production lines capable of producing large-tonnage, irregular components such as H-beams, box beams, and truss-type structures. The annual production capacity exceeds 50,000 tons, and the annual construction area of factory buildings reaches over 1 million square meters. The company also has supporting equipment such as C/Z steel and various profiled steel equipment, with over 30 machines in total. The total assets amount to approximately 40 million USD.

The company specializes in the design, manufacturing, and installation of steel structures. Its products are sold to more than 20 countries and regions worldwide. The main business includes industrial single-story and multi-story plant construction; agricultural cold storage, grain storage, logistics warehouse, and livestock barn construction; as well as petroleum and metallurgy supporting facilities and equipment frame fabrication and installation. The company has a professional team for design, production, construction, and modular research and development. It currently employs over 200 people, including nearly 180 technical specialists. The company also collaborates with Henan University and Xi'an University of Architecture and Technology on technological innovation and talent development.

The company was the first to pass the EN1090 EXC3 steel structure manufacturing certification and ISO3834-2 welding quality management system certification,ISO 9001:2000 international quality management system certification, environmental management certification, and occupational health and safety management certification. It is now a prefabricated building industrial base in Henan Province and holds the first-class qualification certificate for steel structure engineering contracting (the highest level certification issued by the Ministry of Housing and Urban-Rural Development of China).

Over the past 25 years, the company has established deep strategic partnerships with major enterprises such as China National Petroleum, Sinopec, SAIC Motor, Gree Electric Appliances, and China State Construction Engineering Corporation. It has also engaged in trade cooperation with several countries overseas. Notable international projects include the rotary furnace platform project in Vadso, Norway; a new steel structure plant project in Misan, Iraq; an electrolytic aluminum plant construction project in Kalimantan Utara, Indonesia; a 60-kilometer OPRC steel structure bridge project in Sofala, Mozambique; a steel structure plant in Limburg, Belgium; and a joint venture petrochemical project in Zhanjiang, China and Kuwait.

Having grown over the years, with the significant characteristics of "more standardized, more professional, more comprehensive, and more authoritative," the company has become one of the most competitive brands in the market in Central and Western China. To better serve global clients, the company will continue to enhance its technical capabilities, improve its management system, and increase innovation efforts in the future. The goal is to promote enterprise development with technology and intelligence, offering global customers faster and more comprehensive high-quality services.



MEICHEN STEEL STRUCTURE
Company Vision
Establish business with precision and win with quality

In order to better serve our customers in the future development, we will continue to improve our management and technical level, improve the management system, increase innovation efforts, use technology and wisdom to promote the development of the company, let customers truly enjoy faster, more comprehensive and high-quality services, and make greater contributions to social and economic development.

Company Vision
The Development
History Of
The Company
1999

1999.06.18

Established "Mei Chen Company"

2014

2014.10

Won the first-class qualification of professional contracting for steel structure engineering

first-class qualification
2018

2018.03

Cooperate with Henan Sanjian Construction Group

Officially changed its name to "Henan Sanjian Meichen Construction Technology Co., Ltd."

2018.04

Won the first-class qualification of China's steel structure manufacturing enterprise

first-class qualification
2020

2020.02

Participated in the construction of Luoyang "Xiaotangshan"

Rated as "Advanced Unit" by Henan Sanjian Group

2020.12

Recognized as the third batch of prefabricated building industrial bases in Henan Province

Rated as "Advanced Unit" by Henan Sanjian Group

2021

2021.07

Recognized as "Luoyang Enterprise R&D Center"

Recognized as "Luoyang Enterprise Technology Center"

Recognized as a technology-based small and medium-sized enterprise

Passed the "Provincial Engineering Technology Research Center" certification

2023

2023.08

Won the second-level qualification of general contracting for construction engineering

second-level qualification
2026

2026.02

EN1090 EXC3 steel structure manufacturing certification and ISO3834-2 welding quality management system certification

EN1090 EXC3 EN1090 EXC3

Our Factory Show
Corporate Honors
Patent Certificate
Business Partner