The Steel Structure Platform Project for HTAC Turbine Equipment was completed in 2018, using 4,600 tons of steel. The platform was engineered to support large turbine operations, integrating structural safety, load-bearing performance, and environmental durability into a single, robust design.
Support massive turbine components and loads
Maintain long-term stability under both static and dynamic forces
Resist vibrations, thermal shifts, and industrial conditions
Comply with national safety standards and tight tolerances
We used:
High-strength welded steel components
Reinforced modular platform systems for flexibility and integration
Precision-fabricated support columns and bracing
The platform was designed, fabricated, and installed with zero structural tolerance to ensure complete operational reliability.
Our capabilities include:
Platforms for power generation & heavy equipment
One-stop solutions from design to installation
ISO9001 and environmental/safety certifications
High-performance steel structures for extreme conditions
Heavy load capacity
Rapid delivery
On-site installation
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Steel Support Frame for Hydrocracking Unit
Indonesia North Kalimantan Aluminum Plant Project
China-Kuwait Petroleum Refining Plant
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project