This project involved the fabrication and installation of a heavy-duty steel support frame designed for the hydrocracking unit of Luoyang Hongxing New Energy Chemical Co., Ltd. The steel frame serves as the primary structural system for supporting critical hydrocracking equipment, including reactors, heat exchangers, and high-pressure piping systems.

Heavy Equipment Support: Engineered to carry substantial vertical and horizontal loads from hydrocracking process units.
Structural Reliability: Designed to withstand complex dynamic loads, temperature fluctuations, and seismic activities.
Operational Efficiency: Includes integrated maintenance platforms, walkways, and access points for operational safety and ease of maintenance.
Material Quality: All steel components were fabricated using high-strength Q345B structural steel with advanced surface treatment for corrosion protection in aggressive petrochemical environments.
Precise integration with process layout and piping systems
Compliance with petrochemical industry design codes and safety standards
Efficient load distribution to ensure plant reliability and equipment safety
On-time delivery and installation within strict project timelines
Contact us today to explore our customized solutions engineered for safety, durability, and long-term performance.
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Indonesia North Kalimantan Aluminum Plant Project
Steel Platform for HTAC Turbine Equipment
China-Kuwait Petroleum Refining Plant
Steel Structure Factory and Warehouse Project for a Material Processing Production Base
Luoyang Haode Auto Parts Steel Structure Factory Project