+86 13383791128

info@meichensteel.com

Bearing industrial park in Yiyang County Luoyang City, China

Industrial Steel Structure
Industrial Steel Structure
Home Products Industrial Steel StructureAutomated Glass Production Line Steel Structure Factory Building Project
Automated Glass Production Line Steel Structure Factory Building Project
Automated Glass Production Line Steel Structure Factory Building Project
Automated Glass Production Line Steel Structure Factory Building Project
Automated Glass Production Line Steel Structure Factory Building Project
Automated Glass Production Line Steel Structure Factory Building Project
Automated Glass Production Line Steel Structure Factory Building Project

Automated Glass Production Line Steel Structure Factory Building Project

Product Details

This project is a steel structure factory building designed for an automated glass cutting production line, with a total construction area of 8,531.9㎡ and a building height of 12.15m.

The facility adopts a combination of lightweight steel structures and reinforced masonry structures, providing a reliable and efficient industrial production environment for advanced glass manufacturing operations.

The project was designed with a 50-year service life, Grade II fire resistance rating, and Class C seismic fortification category. The main structural components were fabricated using Q355B low alloy structural steel to ensure excellent strength, durability, and long-term operational reliability.

Technical Specifications

Item Specification
Project Type Industrial Steel Structure Factory Building
Application Automated Glass Production Line
Total Construction Area 8,531.9㎡
Building Height 12.15m
Structural System Lightweight Steel Structure + Reinforced Masonry Structure
Main Steel Material Q355B Low Alloy Structural Steel
Design Service Life 50 Years
Seismic Fortification Category Class C
Seismic Fortification Intensity 7 Degrees
Fire Resistance Rating Grade II
Production Hazard Classification Class E Industrial Building
Roof Insulation System 75mm Aluminum Foil Glass Wool Roll

Steel Fabrication & Manufacturing Process

The main steel components were manufactured using an automated welded H-beam production line to ensure consistent quality and fabrication accuracy.

The manufacturing process included:

  • CNC plasma cutting for steel plate preparation
  • Automated H-beam assembly
  • Submerged arc welding
  • CO₂ gas shielded welding
  • Shot blasting for surface preparation
  • Industrial coating and painting

All steel members were shot blasted to Sa2.5 surface preparation grade before coating, providing enhanced corrosion resistance and improving the service life of the steel structure.

After fabrication and quality inspection, the completed steel components were transported to the project site for installation.

Structural Connection & Quality Control

The project adopted 10.9S high-strength friction-type bolts for beam-column connections, ensuring reliable structural performance and load transfer capability.

Welding quality inspection was conducted according to project requirements:

  • Primary welded joints for tension members were inspected to higher-level quality requirements.
  • Compression member welds were inspected according to specified standards.
  • Full-strength connection welds and butt welds were subject to strict quality inspection.
  • Secondary welds were inspected according to standard acceptance requirements.

The steel structure followed strict quality control procedures throughout fabrication, including material inspection, welding control, dimensional inspection, surface treatment verification, and final product inspection.

Surface Treatment & Corrosion Protection

The steel components were treated with Sa2.5 grade shot blasting before painting.

For fire-protected steel members:

  • Two coats of red oxide primer were applied.
  • Total dry film thickness reached 75μm.

For steel members without fire protection requirements:

  • Two coats of anti-corrosion primer and two coats of finishing paint were applied.
  • Outdoor steel components achieved a total dry film thickness of 150μm.
  • Indoor steel components achieved a total dry film thickness of 125μm.

This coating system provides reliable corrosion protection for long-term industrial applications.

Project Highlights

Automated Steel Fabrication Capability

The project demonstrated Meichen’s advanced steel fabrication capabilities through automated production processes, including CNC cutting, H-beam assembly, welding, shot blasting, and integrated coating systems.

High-Strength Steel Structure Application

Q355B low alloy structural steel was selected for the main structure, providing excellent mechanical performance and structural reliability for industrial manufacturing facilities.

Integrated Fabrication & Installation Management

By integrating steel fabrication, quality control, and installation coordination, Meichen ensured efficient project execution, accurate component delivery, and consistent construction quality.