The new steel structure factory project of Luoyang CEMAT New Material Co., Ltd. includes the construction of Plant #1, Plant #2, and a Testing Center. Located in Henan Province, the project is primarily used for refractory material production and related testing, with a designed service life of 50 years and classified as a medium-sized industrial building.
Type: High-rise industrial workshop
Building Area: 5,305.25 m²
Height: 38.1 m
Function: Core production line area, suitable for high-temperature and heavy equipment installation
Plant #2
Type: Single-story workshop with partial three-story auxiliary area
Building Area: 10,923.67 m²
Height: 28.74 m
Function: Large-scale equipment production area and partial three-story auxiliary production rooms
Testing Center
Type: Three-story frame structure
Height: 12.3 m
Function: Product quality inspection and R&D laboratory
Steel Material: Columns and beams made of Q355B steel, box-type welded columns and H-section beams; purlins made of Q355B hot-dip galvanized steel
Connections: Beam-column joints use 10.9S grade torsional shear high-strength bolts, slip resistance coefficient ≥ 0.40
Roof Waterproofing: Grade II waterproofing
Space Layout: Large-span, column-free design to optimize production line arrangement and improve efficiency
Durability: Special anti-corrosion, moisture-proof, and seismic-resistant design for refractory material production environments, ensuring 50-year lifespan
Fast construction: Civil and steel structure work completed in only 90 days
High load capacity: Suitable for heavy machinery and large production equipment
Flexible layout: Large-span steel structure allows flexible production process adjustments
Green & energy-efficient: Recyclable steel structure, reduced resource waste during construction
High safety standards: Slip-resistant, seismic-resistant, corrosion-resistant design for industrial safety
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Steel Support Frame for Hydrocracking Unit
Indonesia North Kalimantan Aluminum Plant Project
Steel Platform for HTAC Turbine Equipment
China-Kuwait Petroleum Refining Plant
Steel Structure Factory and Warehouse Project for a Material Processing Production Base