This steel structure facility was built for Luoyang Zhongyue Precision Bearing Co., Ltd. to support the production of high-precision industrial bearings. The project includes three single-story production workshops, all designed for high ceiling clearance and efficient operations.
Breakdown of Workshop Areas:
Workshop #1: 2,983.03 m²
Workshop #2: 3,262.76 m²
Workshop #3: 14,983.21 m²
Each workshop adopts a single-span steel structure system, offering excellent flexibility, economy, and rapid construction — ideal for precision bearing manufacturing environments.
We specialize in:
✔ Precision Equipment Workshops
✔ Industrial Manufacturing Facilities
✔ Warehousing & Logistics Bases
✔ Commercial & Multi-story Buildings
Certifications
Grade I Steel Structure Engineering License
Grade II General Construction Contracting
ISO 9001, Environmental & Occupational Health Certifications
From design to production to on-site installation, we deliver cost-effective, high-performance steel buildings that meet both domestic and international standards.
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Indonesia North Kalimantan Aluminum Plant Project
Petroleum & Natural Gas Riveting and Welding Factory
Steel Structure Factory and Warehouse Project for a Material Processing Production Base
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project