The Gree Electric Steel Structure Engineering Project was completed in 2019 and is a large-scale steel structure workshop. This project covers a total area of 26,244㎡, with a width of 108 meters and a total roof length of 243 meters. The design ensures high durability, strength, and stability, making it ideal for high-intensity production.
Steel Beams
The steel beams include steel trusses (with lengths of 18 meters and 21 meters) and welded H-beam steel, efficiently supporting the roof and overall structure.
Roof Design
The roof features a space frame structure, offering excellent load-bearing capacity and flexibility, adaptable to various production needs.
This project uses high-quality materials and advanced construction technologies, ensuring efficiency, safety, and reliability in meeting the needs of a large-scale manufacturing facility.
Since 1999, Henan Sanjian Meichen Construction Technology Co., Ltd. has been providing custom steel structure solutions for industrial, warehouse, and commercial building projects.
We specialize in:
✔ Industrial Workshops & Manufacturing Plants
✔ Warehouses & Logistics Facilities
✔ Commercial Buildings
Certifications
Grade I Steel Structure Engineering License
Grade II General Construction Contracting
ISO9001 Certified
We focus on delivering efficient, durable, and high-performance steel structures, ensuring timely project completion and customer satisfaction.
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Indonesia North Kalimantan Aluminum Plant Project
Petroleum & Natural Gas Riveting and Welding Factory
Steel Structure Factory and Warehouse Project for a Material Processing Production Base
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project