This project serves as a key manufacturing base for Erwin Hymer Group's RV vehicles and components in China. Located in the core area of Luoyang Industrial Cluster, the park features three high-standard, long-span steel structure workshops along with office, warehouse, prototype testing, and other support areas, covering a total area of 33,000 m².
The entire facility adopts premium steel structural systems to meet stringent requirements for cleanliness, load-bearing capacity, and spatial flexibility in vehicle manufacturing. The core workshops use large-span, column-free portal frames, providing high load capacity, corrosion resistance, and excellent installation efficiency—ensuring optimal flexibility for RV production line layout.

Industrial-Grade Spatial Layout: Ample clear height with spans exceeding 30 meters supports large equipment installation and streamlined assembly processes.
High-Precision Fabrication: All steel columns and beams are prefabricated with factory-level precision, maintaining installation tolerances within ±2 mm.
Green and Energy-Efficient: Thermal insulation roof panels, eco-friendly wall systems, natural lighting, and high-efficiency ventilation create a low-carbon, energy-saving manufacturing environment.
Future-Proof Design: Structural interfaces are reserved for future capacity expansion, ensuring maximum adaptability.
We offer end-to-end services from design and detailing to fabrication, logistics, and installation. Our focus is on high-standard projects such as industrial plants, logistics centers, manufacturing bases, commercial buildings, and government projects—both domestic and international.
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Indonesia North Kalimantan Aluminum Plant Project
Petroleum & Natural Gas Riveting and Welding Factory
Steel Structure Factory and Warehouse Project for a Material Processing Production Base
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project