The AVIC Lithium Battery (Luoyang) Industrial Park Phase III steel structure project includes the L15 and L16 battery production workshops, primarily used for lithium battery electrode production. The project aims to expand lithium battery production capacity, supporting energy technology developments in aviation, electric vehicles, and further driving innovation and manufacturing upgrades in China’s battery industry.
L15 Battery Production Workshop
Structure: Steel frame structure, light steel roof
Building Size: Total length 130.48m, width 62.48m
Span: 8 + 9 × 6m
Column Spacing: 9m, 10m
Floor Area: Main workshop 26,304.78㎡, Corridor 273.98㎡
Number of Floors: Multi-story structure, designed for battery production line layout
Special Design: Circular fire lanes around the building ensure safety
Design Features: Light steel roof system, reduces overall weight, and provides adequate span flexibility.
L16 Battery Production Workshop
Structure: Light steel structure
Building Size: Total length 208.48m, width 46.48m
Span: 10 + 18 + 18m
Column Spacing: 8m
Floor Area: Main workshop 11,913.25㎡, Total building area 27,015.15㎡
Number of Floors: Main workshop is one floor, partial three-story auxiliary production mezzanine
Workshop Height: Main workshop height 12.4m, partial workshop 17.3m
Design Features: Adequate space for lithium battery production, storage, and ancillary facilities.
Steel Frame Design: The L15 workshop uses a steel frame structure to offer strong support and flexible internal layout for production equipment. The L16 workshop uses a light steel structure for better seismic resistance and lower self-weight.
Efficient Fire Safety: The L15 workshop includes circular fire lanes around the building for easy evacuation in case of emergencies.
Modular Design & Fast Construction: The use of modular steel structures and prefabricated components significantly reduces construction time and improves accuracy, ensuring on-time delivery.
Flexible Ceiling Height Design: L16 has a partial three-story mezzanine for future equipment expansion.
Functionality & Expandability: Both workshops not only meet current battery production needs but also reserve space for future equipment upgrades and capacity expansion.
High-Quality Steel Construction: Q355B steel provides exceptional load-bearing capacity and seismic resistance, ensuring the long-term stability of the factory.
Modern Design: The design meets the unique needs of battery production, such as space layout, equipment support, and air circulation.
Environmental Adaptability: The factory includes an air purification system and energy-efficient lighting, providing a clean, safe working environment.
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Indonesia North Kalimantan Aluminum Plant Project
Petroleum & Natural Gas Riveting and Welding Factory
Steel Structure Factory and Warehouse Project for a Material Processing Production Base
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project