This project, located in the Donghai Island New District of Zhanjiang Economic and Technological Development Zone in Guangdong, provides a comprehensive support steel framework solution for the China-Kuwait joint venture petroleum refining plant. The total steel usage for this project is approximately 8,000 tons, with a cost of around 65 million RMB. It is primarily used to support key equipment in the refinery, such as reactors, heat exchangers, and piping systems. The integrated support framework's design and construction ensure stable support for the equipment, meeting the stringent demands of the petrochemical industry, including high temperatures, heavy loads, and dynamic loads.

Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Steel Support Frame for Hydrocracking Unit
Indonesia North Kalimantan Aluminum Plant Project
Steel Platform for HTAC Turbine Equipment
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project