The project at Jiyuan Passenger South Station Transportation Hub Logistics Park includes one 4-story information center and six single-story logistics warehouses. Each warehouse has a floor area of approximately 2,800 m² and a height of 8.53 meters, using a light-weight portal steel frame structure.
✅Flexible Expansion: Easily scalable or adjustable to support long-term business growth.
We provide fast delivery, high-quality standards, and end-to-end solutions covering design, fabrication, and installation. Certified by ISO9001, we meet international standards for safety, durability, and performance.
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Indonesia North Kalimantan Aluminum Plant Project
Petroleum & Natural Gas Riveting and Welding Factory
Steel Structure Factory and Warehouse Project for a Material Processing Production Base
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project