This single-story multifunctional warehouse adopts a portal steel frame structure. The layout includes 4 spans of 24 meters each, totaling 180 meters in length. The structural system is formed by 16 sets of portal steel frames.
The warehouse is designed for a service life of 50 years and built to withstand a seismic intensity of 7.
The client required a high-performance warehouse to support large-scale logistics operations and seamless access for trucks and forklifts.
Key design principles included:
✅ Column-free open interior space for smooth material flow
✅ High load-bearing capacity for large-scale storage and handling
✅ All-weather covered loading bays and canopy
✅ Forklift entry points optimized for operational efficiency
These features address the critical concerns of logistics and warehousing clients—speed, safety, durability, and scalability.
✅ Fast construction and delivery
✅ Cost-effective for large-scale warehousing
✅ Flexible design adapted to logistics flows
✅ Low maintenance, long lifespan
✅ Eco-friendly and recyclable
✅ Ideal for automation and smart warehousing systems
Whether it’s a distribution center, e-commerce warehouse, or cold storage facility, steel structures offer unmatched efficiency, speed, and performance.
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Indonesia North Kalimantan Aluminum Plant Project
Petroleum & Natural Gas Riveting and Welding Factory
Steel Structure Factory and Warehouse Project for a Material Processing Production Base
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project