Sanjian Meichen provides
one-stop customized
steel structure
solutions
Our skilled team of engineers and architects designs customized steel structures using advanced tools for optimized performance, safety, and cost-efficiency. From industrial facilities to large-span commercial buildings, we deliver design plans meeting local and international standards. We collaborate closely with clients to bring their vision to life, offering technical support throughout the process.
Office Building Steel Structure Project
Shield Machine Steel Structure Workshop Project
Shengmante Multi-storey Factory
China Science and Technology Engineering
Hot and Sour Noodle Steel Structure Project
Shenyu Steel Structure Project
Hongxing Petrochemical
Hongxing Engineering
Ruichang Petrochemical
Steel Turbine Equipment Support Platform
Steel Structure Sports Center
Steel Stadium
Industrial steel structures are the backbone of modern manufacturing and warehousing facilities. These structures are renowned for their strength, durability, and versatility, making them ideal for a variety of industrial applications. They are designed to withstand the rigors of heavy machinery, large loads, and the demanding conditions often present in industrial settings.
Agricultural steel structures are the epitome of functionality and resilience in the agricultural sector. These structures are specifically designed to withstand the unique challenges posed by the natural environment and the demands of modern farming practices. They offer a range of benefits that make them an ideal choice for a variety of agricultural applications, from barns and silos to storage facilities and livestock shelters.
Metallurgical steel structures are specifically designed to meet the rigorous demands of the metallurgical industry, which often involves extreme conditions such as high temperatures, heavy loads, and corrosive environments. These structures play a critical role in various processes like smelting, refining, and the production of metals.
Meichen Steel Structure Delivery
Steel structure Installation Detail Display
Steel Structure Workshop Construction Show
Steel Structure Shed Installation
The Role of Steel Structural Wind Columns
Steel Structure Lifting Detail Display
How Steel Villas Are Built
Primary Secondary The Difference Between Steel Structures