This project is an essential part of the Qian Kun Bay Scenic Area cableway system, including two steel structure buildings: the Huifengzhai Return Station and the Qingshuiwan Drive Station. It aims to provide safe and stable operational support for the scenic area’s cableway system. Completed in 2018, the project used a total of 1,200 tons of steel.
Project Type: Steel structure engineering
Main Buildings: Huifengzhai Return Station, Qingshuiwan Drive Station
Steel Consumption: 1,200 tons
Completion Year: 2018
Functional Roles
Drive Station: Provides power system support and serves as the operation control center of the cableway.
Return Station: Adjusts the direction of the cableway line and transfers loads.
High Structural Safety: The steel structure design takes into account dynamic loads during cableway operation and extreme weather conditions, ensuring long-term stability and safety.
Efficient Construction Period: Modular steel structure installation technology significantly shortened the construction cycle, minimizing impacts on scenic area operations.
Weather Resistance & Aesthetics: The exterior design blends harmoniously with the natural environment and uses anti-corrosion protection for improved durability.
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Indonesia North Kalimantan Aluminum Plant Project
Steel Structure Factory and Warehouse Project for a Material Processing Production Base
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project
Oil & Gas Modular Steel Structure Fabrication Project