In the petrochemical industry, construction projects are often complex, requiring high precision, safety, and efficiency. Traditional construction methods, especially in high-risk environments like working at great heights or in confined spaces, pose significant safety concerns and logistical challenges. However, modular construction has emerged as a game-changer, transforming the way we approach steel structure projects.
This blog post explores the concept of modular construction in the petrochemical industry, highlighting its benefits, various applications, and how it has enhanced project safety, speed, and quality. Whether it's in large-scale refinery construction, pipeline installation, or warehouse design, modular construction is reshaping how petrochemical projects are carried out.
Modular construction is an engineering construction method that transforms traditional on-site construction into a process of factory-prefabrication + on-site assembly. This approach involves creating large modules or "parts" in a controlled factory environment, which are then transported to the construction site and assembled into a complete structure.
A Simple Analogy: Think of modular construction like building a complex structure with LEGO blocks. Instead of constructing each piece from scratch at the construction site, you preassemble most parts in a factory, then transport them to the site and put them together like assembling blocks.
For example, in the petrochemical sector, steel structures, piping, and equipment can all be prefabricated as modules in the factory. These modules are then brought to the site, where they are lifted by cranes and assembled into the final installation.
The main benefit of modular construction is its speed. By manufacturing the majority of the steel structure components in a factory, modules are produced simultaneously, reducing construction time on-site. This not only speeds up the project but also reduces the number of workers required at the site, enhancing safety.
In fact, multiple modules can be constructed in different factory workshops simultaneously, improving production efficiency. Additionally, by minimizing on-site work, the risk of delays due to weather, labor shortages, or safety incidents is significantly reduced.
Safety is paramount in any construction project, particularly in the petrochemical industry, where high-risk tasks such as working at heights are common. Modular construction drastically reduces the amount of high-risk work conducted on-site, particularly high-altitude welding and installation tasks.
Most of the assembly work happens on the ground level in controlled, safer factory environments, moving the dangerous tasks from the construction site to a much more secure and manageable space. Workers no longer need to perform tasks in dangerous conditions, such as welding or installing equipment at extreme heights.
Manufacturing modules in a factory setting ensures better quality control. In a controlled environment, it’s easier to apply consistent welding standards, inspection, and testing, resulting in higher-quality steel structures and components. The factory setting allows for better monitoring of each stage of production, ensuring that each module meets the required specifications before it is sent to the construction site.
In the petrochemical industry, modular construction can be divided into three main categories:
In this method, the pipe racks or equipment platforms are broken down into "modular blocks". These blocks are preassembled in a factory where they undergo processes like welding, painting, and anti-corrosion treatment, before being shipped to the construction site for final assembly.
Benefits:
Ensures high-quality welding and corrosion protection.
Speeds up the construction process, reducing on-site assembly time.
For large tower equipment (e.g., distillation columns or reactors), the steel structure platforms and piping are preassembled on the ground level. These platforms are designed and fitted with all the necessary equipment, such as piping, electrical instrumentation, and other auxiliary systems, before being lifted into place.
Benefits:
Reduces the amount of work that needs to be done at heights.
Ensures that the equipment is fully assembled and tested before installation.
This involves prefabricating piping in the factory, along with necessary fittings, elbows, flanges, and valves. The pipes are then welded into modules that are pre-assembled in the factory, reducing the amount of high-altitude pipe installation required on-site.
Benefits:
Saves time by pre-assembling the pipes in the factory.
Reduces errors and the need for adjustments on-site.
By conducting the majority of the work off-site, modular construction significantly reduces construction timelines. Multiple modules can be worked on simultaneously in different workshops, allowing for faster assembly at the construction site.
For instance, Shijian Company demonstrated that using modular construction, 90% of their work on the Zhejiang Petrochemical High-Pressure Polyethylene Project was completed on the ground, reducing high-altitude welding by 60% and eliminating over 320 safety risks. This efficiency boost translated into time savings of up to 17 days in the project schedule.
As mentioned earlier, modular construction minimizes high-risk operations at construction sites. By shifting the bulk of the work to controlled, safe factory environments, workers are exposed to fewer risks, such as falling from heights or working in hazardous conditions.
Faster project completion and better quality control both lead to significant cost reductions. The reduced on-site labor, fewer accidents, and improved efficiency all translate into lower overall project costs. Additionally, since the modules are made in a factory, material wastage is minimized.
For example, Nanjing Engineering Company used modular construction for their Amiral Project and reduced labor costs by approximately 45%, improving construction efficiency by 3.5 times.
In their Persian Gulf project, Shijian Company utilized modular construction to build steel structures and install large equipment. The company saw massive improvements in efficiency by conducting centralized pre-fabrication, welding, and lifting at the site. The steel framework was completed 3.5 times faster than traditional methods.
Time saved: 45% reduction in labor and machinery costs.
Steel structure weight: 26,000 tons were installed ahead of schedule.
Tianjin Nangang Ethylene Project saw tremendous success with modular construction. The company used a “one site, multiple factories” strategy, breaking down the steel structures, piping, and electrical installations into individual modules built in various factories. The results included:
80% reduction in high-altitude work
17 days ahead of schedule on installation.
MEICHEN STEEL STRUCTURE is at the forefront of adopting modular construction techniques for the petrochemical and industrial sectors. With over 25 years of experience in the steel structure industry, we specialize in providing high-quality, customizable steel structures designed to meet your project’s unique requirements. From modular steel frame construction to prefabricated equipment platforms, we ensure that your project is delivered on time, within budget, and with the highest safety standards.
Our team of expert engineers works closely with you from the design phase to project completion, offering pre-fabrication, testing, and assembly services that meet international standards. Whether you're building a refinery, a warehouse, or any industrial facility, we offer the innovative solutions you need to succeed.
If you're looking for a reliable steel structure supplier to handle your next petrochemical or industrial project, MEICHEN STEEL STRUCTURE is your trusted partner. With our expertise in modular construction, we can help you streamline your project, reduce risks, and improve efficiency.
Contact us today to discuss your project requirements, and let’s build your future together!