Time:2026-05-15 06:40:01 Source:Sanjian Meichen Steel Structure
A project delegation from Australia recently visited Meichen Steel Structure Co., Ltd. to conduct a comprehensive factory audit and technical evaluation for their upcoming cold storage facility, marking a significant step toward project cooperation.
The client is planning to construct a 1,000-square-meter cold storage warehouse for plant cultivation, including a steel structure main frame integrated with advanced refrigeration and temperature control systems. Following detailed quotation discussions and technical exchanges, the client flew directly to Luoyang Airport to inspect Meichen’s production facility and confirm the proposed design solutions in person.
During the visit, the Australian delegation conducted an in-depth inspection of Meichen’s production workshops, observing fabrication processes for steel structures designed specifically for cold storage applications. Meichen’s engineering team presented:
The client expressed strong confidence in Meichen’s production capacity, technical expertise, and ability to deliver high-quality, fully engineered cold storage solutions.
To further validate Meichen’s capabilities, the client was also taken to completed cold storage projects, allowing them to evaluate the practical application of steel structures combined with refrigeration systems. The client reviewed:
The Australian delegation was highly impressed by Meichen’s demonstrated ability to deliver reliable, efficient, and technically precise cold storage facilities.
Following the factory audit and reference project visit, the client has shown strong recognition of Meichen’s expertise and project execution capability.
The project design is currently undergoing final technical optimization. Upon completion, both parties are expected to proceed with contract signing, officially initiating the construction phase.
This visit underscores Meichen’s commitment to transparency, engineering excellence, and customer trust, while demonstrating our readiness to support international clients with specialized industrial projects.
Founded in 1999, Meichen Steel Structure Co., Ltd. specializes in high-quality, customized steel structures for industrial, agricultural, and energy projects. The company produces welded H sections, box columns, trusses, equipment platforms, and complex structural systems.
With over 20 years of fabrication experience, advanced manufacturing facilities, and international certifications including EN1090 EXC3 and ISO quality systems, Meichen has become a trusted partner for EPC contractors, engineering firms, and project developers worldwide.
Through precise engineering, stringent quality control, and reliable project execution, Meichen helps clients reduce risks, optimize costs, and ensure successful project delivery.
We welcome international clients to visit our factory and explore collaboration opportunities for specialized steel structure projects.
Steel Structure Workshop Solutions
Steel Warehouse Solutions
Heavy Steel Structures for Equipment
Indonesia North Kalimantan Aluminum Plant Project
Steel Structure Factory and Warehouse Project for a Material Processing Production Base
Luoyang Haode Auto Parts Steel Structure Factory Project
Automated Glass Production Line Steel Structure Factory Building Project
Oil & Gas Modular Steel Structure Fabrication Project