+86 15838570458

info@meichensteel.com

Bearing industrial park in Yiyang County Luoyang City, China

Industrial Steel Structure
Industrial Steel Structure
Home Products Industrial Steel StructureAVIC Lithium Battery Steel Structure Project
AVIC Lithium Battery Steel Structure Project
AVIC Lithium Battery Steel Structure Project
AVIC Lithium Battery Steel Structure Project
AVIC Lithium Battery Steel Structure Project
AVIC Lithium Battery Steel Structure Project
AVIC Lithium Battery Steel Structure Project
AVIC Lithium Battery Steel Structure Project
AVIC Lithium Battery Steel Structure Project

AVIC Lithium Battery Steel Structure Project

  • Project name: AVIC Lithium Battery (Luoyang) Steel Structure Project
  • Total construction area: 63,000 ㎡
  • Steel usage: 4,000 tons
  • Construction year: 2017
  • A steel structure project refers to the design, fabrication, and construction of buildings or infrastructures that are primarily composed of steel components. These projects can range from small industrial buildings to large-scale high-rise office towers, bridges, stadiums, and even wind turbine structures.
Product Details

Steel structure construction involves assembling prefabricated steel components to create various building types, including industrial, commercial, and residential structures. This method is known for its speed, durability, and versatility, making it an ideal choice for modern construction projects. Below is an overview of the steel structure construction process, its benefits, and applications.

AVIC Lithium Battery Steel Structure Project Construction Process

Planning and Design:

Site Survey: Assess the construction site to understand soil conditions, climate, and project requirements.

Design Phase: Develop detailed architectural and structural designs using CAD and BIM technologies. This includes load calculations, wind resistance, and seismic stability.

Manufacturing and Fabrication:

Component Manufacturing: Prefabrication of steel components (beams, columns, trusses, etc.) in a controlled factory environment.

Surface Treatments: Galvanizing, powder coating, or painting for corrosion resistance and aesthetics.

Quality Control: Rigorous inspection to ensure components meet standards.

Site Preparation:

Foundation Work: Lay a strong foundation based on soil conditions and structure type. Steel structures typically require shallow foundations like pad or strip footings.

Logistics: Transport prefabricated components to the site.

Assembly and Erection:

Steel Frame Erection: Use cranes and lifting equipment to assemble steel columns, beams, and trusses. Bolt or weld connections for stability.

Alignment and Leveling: Ensure proper alignment and leveling using precise instruments like laser levels.

Roof and Wall Installation: Attach cladding panels, purlins, and insulation materials.

Finishing Work:

Utilities Installation: Electrical, plumbing, HVAC systems, and fireproofing.

Painting and Final Coating: Enhance aesthetics and protect the structure.

Inspection: Perform a final inspection to ensure compliance with design and safety standards.

Related Products

Related News