+86 15838570458

info@meichensteel.com

Bearing industrial park in Yiyang County Luoyang City, China

Industrial Steel Structure
Industrial Steel Structure
Home Products Industrial Steel StructureElectrical Steel Structure Factory Project
Electrical Steel Structure Factory Project
Electrical Steel Structure Factory Project
Electrical Steel Structure Factory Project
Electrical Steel Structure Factory Project
Electrical Steel Structure Factory Project
Electrical Steel Structure Factory Project
Electrical Steel Structure Factory Project
Electrical Steel Structure Factory Project

Electrical Steel Structure Factory Project

  • Project Name: Electrical Steel Structure Factory Project
  • Total construction area: 6915.47 ²
  • The structure of this project is portal rigid frame lightweight housing steel structure (steel columns, steel beams, colour steel plate enclosure); indoor and outdoor height difference of 0.30m, building height workshop 12.75m (outdoor ground to the eaves), west annex building 15.0m (outdoor ground to the roof), building level for single-storey workshop; building covers an area of 6915.47m2, total construction area 6915.47m².
Product Details

Electrical Steel Structure Factory Project Introduction

An electrical steel structure factory project focuses on establishing a facility dedicated to the design, manufacturing, and assembly of steel components specifically for electrical and power-related infrastructure. These factories support projects such as power transmission, substations, and renewable energy installations by providing high-quality steel structures that ensure durability and safety.

Henan steel structure Luoyang Shangke Electric Technology Co., Ltd. project This project is Luoyang Shangke Electric Technology Co., Ltd. 1 #, 2 # production workshop project, located in Luoyang City, Henan Province, Yiyang County Industrial Cluster, the structure of this project is portal rigid frame lightweight housing steel structure (steel columns, steel beams, colour steel plate enclosure); indoor and outdoor height difference of 0.30m, building height workshop 12.75m (outdoor ground to the eaves), west annex building 15.0m (outdoor ground to the roof), building level for single-storey workshop; building covers an area of 6915.47m2, total construction area 6915.47m². The height of the building is 12.75m for workshop (from outdoor floor to eaves), 15.0m for the annex building on the west side (from outdoor floor to roof), and the number of floors of the building is single-storey workshop; the building occupies an area of 6,915.47 square metres, and the total building area is 6,915.47 square metres.

This project is a factory building, the design service life of 50 years; structural safety level II; foundation design level C; fire resistance level Ⅱ; seismic defence category C; production fire hazard for category E; building roof waterproofing level Ⅱ; steel structure roof using compression steel self-waterproofing; workshop wall elevation of -0.06m or more, 1.2m or less for the 240-thick MU10 sintered gangue brick, M7.5 mixed sand brick, and M7.5 mixed sand brick. M7.5 mixed mortar masonry; elevation of 1.2m above the wall using single-layer compression steel plate, type Y28-205-820 type 0.30mm single-layer compression steel plate.

Key Features of the Electrical Steel Structure Factory

Design Capabilities:

Use of advanced tools like CAD, BIM, and structural analysis software to create accurate designs.

Focus on structures designed for high strength, corrosion resistance, and compatibility with electrical installations.

Production Line:

Cutting and Drilling: CNC machines for precision cutting and hole drilling.

Welding: Automated welding systems for strong and uniform connections.

Surface Treatment: Hot-dip galvanizing or powder coating for corrosion resistance.

Assembly: Pre-assembly of parts to simplify on-site construction.

Automation:

Adoption of Industry 4.0 technologies for better productivity and monitoring.

Robotic systems for repetitive tasks, reducing labor intensity and improving accuracy.

Sustainability:

Use of recyclable steel.

Energy-efficient production techniques.

Environmentally friendly surface treatments to comply with local regulations.

Related Products

Related News