+86 15838570458

info@meichensteel.com

Bearing industrial park in Yiyang County Luoyang City, China

Metallurgical Steel Structure
Metallurgical Steel Structure
Home Products Metallurgical Steel StructureRefining and Chemical Integration Shaped Steel Structure Project
Refining and Chemical Integration Shaped Steel Structure Project
Refining and Chemical Integration Shaped Steel Structure Project
Refining and Chemical Integration Shaped Steel Structure Project
Refining and Chemical Integration Shaped Steel Structure Project
Refining and Chemical Integration Shaped Steel Structure Project
Refining and Chemical Integration Shaped Steel Structure Project
Refining and Chemical Integration Shaped Steel Structure Project
Refining and Chemical Integration Shaped Steel Structure Project

Refining and Chemical Integration Shaped Steel Structure Project

  • Project name: Guangzhou Zhongke Refining and Chemical Integration Special-shaped Steel Structure Project
  • Steel consumption: 8,000 tons
  • Construction year: 2018
  • Refining and chemical integration steel structure projects involve the design and construction of steel frameworks that support the complex processes of refining and chemical production. These projects require specialized materials and engineering solutions due to the diverse and often hazardous nature of the chemicals being processed, the high temperatures and pressures involved, and the need for strict safety and environmental standards.
Product Details

Guangzhou Zhongke Refining and Chemical Integration Shaped Steel Structure Project is located in Donghai Island New District, Zhanjiang Economic and Technological Development Zone, Guangdong Province, which is a steel structure project with a steel consumption of about 8,000 tonnes and a cost of about 6.5 million.

Key Aspects of Steel Structures in Refining and Chemical Integration:

Design Requirements:

Load Bearing: Must support static loads (equipment weight) and dynamic loads (movement of fluids, machinery vibration).

Seismic and Wind Resistance: Designed to withstand earthquakes and wind forces.

Thermal Expansion: Accommodates the high-temperature variations in processing plants.

Materials:

High-strength steel with corrosion resistance is commonly used to withstand harsh chemical environments.

Coatings and treatments (e.g., galvanization or epoxy coatings) for additional protection.

Integration Features:

Modular Design: Prefabricated sections for ease of assembly and future upgrades.

Process Piping and Instrumentation Support: Integrated to house pipes, valves, and control instruments.

Safety Systems: Equipped with platforms, ladders, and escape routes for maintenance and emergencies.

Applications:

Refining: Supports equipment like distillation columns, heat exchangers, and storage tanks.

Chemical Plants: Houses reactors, separators, and other specialized process units.

Compliance and Standards:

Adherence to engineering standards like ASME, API, or Eurocodes.

Regular inspections and maintenance to ensure structural integrity.

Related Products

Related News